Public Notice
CATEGORICAL EXCLUSION DETERMINATION
For the City of Newcastle TANK#2 AND
SYSTEM IMPROVEMENTS Project,
Weston County, Wyoming
The Department of Environmental Quality/Water Quality Division (DEQ) has conducted a
review of the proposed TANK #2 AND SYSTEM IMPROVEMENTS project in accordance with EPA and State of Wyoming procedures for implementing the State Environmental Review Process. DEQ has determined that this project is eligible for a categorical exclusion. Accordingly, DEQ is exempting the project from further substantive environmental review requirements under the State Environmental Review Process. Neither Environmental Assessment/Finding of No
Significant Impact nor an Environmental Impact Statement/Record of Decision will be required
for the proposed action. The following is a brief description of the situation and the proposed
action and a brief statement of how the action meets the criteria for a categorical exclusion.
This project includes replacement of the existing tank inlet water main and installation of a separate outlet water main to extend to the water distribution system along Divide Ave. and terminating at Sheridan St. Install new 12-inch PVC inlet and 8-inch PVC outlet lines outside the landfill footprint Relocating the control station to City-owned property east of Divide Avenue. The project also includes an abrasive blast and recoat of Tank #2, interior and exterior. The estimated cost is $3,418,148 and the City of Newcastle is borrowing $3,000,000 from the SRF program. The repayment was included in the 2024 water rate analysis and was included in the rate increase in 2026. There will not be another rate increase for this project.
The City of Newcastle is aware of and accepts the fact that they will be responsible for any required mitigative actions associated with and including storm water runoff, erosion control, archeological/historic artifacts, and air quality concerns. These will be part of the standard State
Revolving Funds Program contract conditions. Temporary construction-related impacts such as noise, dust, and traffic disruption will be minimized through standard best management practices (BMPs).
DEQ is granting an exclusion because the project will primarily occur within previously disturbed right-of-way and will not affect wetlands, floodplains, threatened or endangered species, or cultural/historic resources. No long-+term adverse environmental effects are expected, and limited mitigation measures beyond standard BMPs are required. This project will expand to existing infrastructure to create redundancy in the distribution system. This project will be primarily constructed in previously disturbed ground, specifically ground disturbed by the Landfill #1, paved road, curb gutter, sidewalk, and storm sewer. DEQ has determined that exempting the proposed project from further review under the State Environmental Review Process will not result in adverse impacts to the population or the area of City of Newcastle, Weston County, Wyoming.
The determination shall become effective upon distribution by the Department and may be reevaluated and the determination changed at any time that adverse information is made available. The documentation to support this decision will be on file in the DEQ Cheyenne Office and is available for public review upon request. To request a copy of the categorical exclusion, contact:
Greg Crocker, SRF Project Manager
Tim Eisenhauer, SRF Principal Engineer
Department of Environmental Quality
200 W. 17th Street
Suite 200
Cheyenne, WY 82002
Tel. (307) 777-6941
FAX (307) 635-1784
Para espanol, visited eq.wyoming.gov Americans with Disabilities Act: special assistance or alternative formats will be made available upon request for individuals with disabilities.
(Publish: November 12, November 19, and November 26, 2026)